Geotechnical pipe bag project

Faced with the odor of river silt and heavy metals polluting the environment, the market for silt treatment in my country is imminent.


Geotechnical pipe bag or a large-scale pipe bag and inclusion made of high-strength geotextile, its diameter can be changed according to needs, and the length has exceeded tens of meters. Geotechnical pipe bags were originally used in dike engineering. At present, through the efforts of the majority of technical workers, they have been applied to environmental protection, agriculture and other fields. With the deepening of people's research, their application fields will become more and more extensive. The material of the geotechnical tube bag is generally made of high-toughness polypropylene, generally black; the commonly used material is adjusted to 400g/㎡ according to different specifications of products; the length is not limited, the width can be multi-spliced and the width is not limited, but it directly affects the wider the strength of the material The higher the material strength is required; the filling height is basically set at two-thirds of the tube bag diameter.


Comparison of dredging products


1. The traditional natural dewatering method of the sludge disposal site: This method has simple technology and large area for the disposal of river bottom sludge. It is a common method for domestic sludge treatment projects (including the cleaning and treatment of Taihe river bottom sludge). However, the efficiency of this dehydration method is very low, and this method of using a storage yard to treat contaminated bottom sludge still has certain environmental and safety hazards. Since the bottom mud in the storage yard is exposed and is in direct contact with the surrounding environment, if the remaining water treatment of the storage yard does not meet the standards, it will cause secondary pollution to the surrounding water bodies.


2. Mechanical dewatering method: to deal with organic pollution and heavy metal contaminated bottom sludge. Although the dewatering effect is good, there are high one-time equipment investment, power energy consumption, construction of workshops and workshops, and the processing capacity cannot meet the short construction period of river reservoir bottom sludge treatment. Insufficient requirements.


3. Geotechnical pipe bag dredging: Convenience: The diameter and length of the geotechnical pipe bag can be adjusted as required, with strong plasticity, stackable, and convenient transportation. Environmental protection: fully enclosed construction, almost no noise, not easy to cause secondary pollution. High efficiency: It can fully meet the treatment capacity of wastewater and sludge. The treatment capacity can be increased or decreased according to the flow rate of the pump. The volume reduction effect is good: the sludge volume can be basically reduced by more than 90% within one month, and the subsequent removal and treatment are easier. Wide application: Both large and small wastewater treatment projects and sludge dewatering projects can be used.


Construction method of geotechnical pipe bag:


The first step is filling, using high-strength and permeable geotextiles to make the actual bag body, and then filling the mud into the bag body.


The second step is drainage. Because the geotextile forming the bag body has small holes, it can retain the solids in the mud and drain the water out of the mud. This can effectively reduce the volume of the contents in the bag and the bag can be filled repeatedly , Until it reaches the allowable height of the bag material, and the discharged water can be reused.


The third step is consolidation. After multiple filling and drainage, the fine particles left in the bag will gradually be consolidated due to the drying effect.


Technical advantages of dredging pipe bag


(1) The volume of the filter bag can be adjusted arbitrarily, with a large range and flexible engineering processing capacity;


(2) No need to invest in dehydration machinery, no electric power configuration, no need to move;


(3) The filter bag system has low investment, very little manpower and simple operation;


(4) The filter bag can be placed at any suitable place near the river and lake, and the drainage can be directly flowed into the river and lake with clear water;


(5) The filter bag can be placed at multiple points according to the operation of the dredging vessel, which is suitable for in-situ dehydration of silt;


(6) The sludge is a closed operation during the dehydration process, which can avoid secondary pollution;


(7) The moisture content of the sludge in the bag can be adjusted according to the number of filling times, pressure and idle time of the filter bag;


(8) Special filter cloth is used, with good filtering performance, high strength and not easy to age;


(9) The formula of the medicament can be adjusted according to the condition of the sludge to achieve the harmless treatment of the sludge;


(10) The dewatered silt can be used as slope protection soil for rivers and lakes, or soil for agriculture and greening;


(11) The system project has low investment, low operating cost and short construction period. Size selection


Laying and fixing of high tenacity polypropylene geotechnical pipe bag 


Geotechnical pipe bag laying is to be laid by artificial tide when the beach is exposed at low tide level. Before laying, the stones, sundries and other objects that impede the quality should be removed. 


The processed bag is transported to the construction site and laid according to the lofting position. In order to prevent the tube bag from rolling, slipping and displacement during filling, and to ensure the accurate position of the mud bag, the tube bag should be anchored and fixed after the tube bag is laid. The anchoring of the bottom pipe bag is done by laying anchor steel pipes on the outside of the pipe bag, and then using the anchor ring on the pipe bag and the steel pipe to connect and anchor. The filled geo-bags are anchored by the geo-belt and the lower tube bag.


High tenacity polypropylene geotechnical pipe bag filling


The high-toughness polypropylene geotechnical pipe bag is filled with a 22KW flush-suction mud pump unit. The mud pump unit is fixed on a flat boat. After the soil is sucked and sucked underwater, the mud pump mud pipe is led to the paved bag In the filling cuff of the body, the mud pipe is used for sand filling.


When filling the geotechnical pipe bag, the mud is poured into the cuff at one end at the earliest, and the pipe at the other end is drained, which is conducive to sedimentation and efficiency. During the filling process, it is necessary to check the mud and sand accumulation at the mud pipe mouth frequently, adjust the position of the mud pipe mouth in time, constantly adjust the mud filling cuffs, and step on the top of the bag body manually during filling to make the soil particles rearrange and tighten. Make the sand filling in the bag even and full, ensure the filling is flat, and accelerate the drainage and consolidation speed of the bag body. When the entire sand bag reaches the screen slurry stage, appropriately reduce the filling sand bag machinery or stop filling to prevent the bag from bursting and leave a certain amount of consolidation Dehydration time. During the filling process, the surveyor controls the top elevation of each layer of sand bag according to the cross-section drawing of the sand bag core. If the ideal height is not reached once during the filling process, after the sand bag is slightly consolidated, perform a second or more Fill it up to the desired degree of filling.